Plan extra material
Lumber buying allowance: extra material, waste and yield
A buying allowance adds a chosen percentage to your entered lumber volume. With a 20-board-foot tally and a 25% allowance, you add 5 BF and get a planning total of 25 BF. The right addition depends on the stock and the parts you need to make.
In LumberMeasure, Buying allowance (%) starts at zero. You choose the percentage. Before using the result as a shopping quantity, check the available boards and your cutting layout.
Decide what your starting volume describes
Your starting tally might describe selected stock boards, finished project parts, or a supplier order that already includes extra material. Keep a note of that basis alongside your estimate.
For selected stock, confirm the actual available sizes. For finished parts, work out which stock dimensions can produce them. A percentage alone cannot show whether a long part fits, where a defect falls, or how much thickness preparation will remove.
When comparing costs, use the dimensions and tally basis that the supplier prices. Our rough and surfaced lumber guide explains how measured volume and billed board footage can differ.
Calculate the added volume and cost
The allowance uses the entered board footage as its base:
- Extra board feet
- Entered board feet × allowance percentage ÷ 100
- Volume with allowance
- Entered board feet + extra board feet
Five boards entered as 1 inch thick × 6 inches wide × 8 feet long total 20 BF: 1 × 6 × 8 ÷ 12 × 5 = 20. At an illustrative $7.50 per BF, their base material cost is $150.00.
Scroll across the table to see every column.
| Allowance | Base BF | Extra BF | Volume with allowance (BF) | Cost with allowance (USD) |
|---|---|---|---|---|
| 0% | 20 | 0 | 20 | $150.00 |
| 12.5% | 20 | 2.5 | 22.5 | $168.75 |
| 25% | 20 | 5 | 25 | $187.50 |
| 50% | 20 | 10 | 30 | $225.00 |
Multiply volume with allowance by the shared price per BF to estimate cost with allowance. Tax, delivery and milling charges are separate. The calculator keeps full precision before rounding the displayed amounts.
The quantity in this example remains five entered boards. Adding a percentage does not select extra physical boards or round an order up to stock sizes. Check the pieces you will actually buy and the supplier's tally rules.
Distinguish an addition from a yield estimate
An allowance percentage describes how much you add to the starting volume. A yield percentage describes how much output a process produces from its input. They use different denominators.
Suppose, purely for arithmetic, that a process produces usable output equal to 75% of its input volume, with both volumes measured on a consistent basis. To obtain 20 BF of output, the required input would be 20 ÷ 0.75 = 26 2/3 BF. That is 33 1/3% extra relative to the 20-BF target.
Adding 25% gives 25 BF instead. At that hypothetical 75% yield, 25 BF would produce 18.75 BF. The original 20 BF is 80% of the 25-BF planning total, but that ratio supplies no evidence of an actual cutting yield.
LumberMeasure has an allowance field; it does not predict yield or optimize a cutting layout. The 75% figure here is an assumption used to explain the arithmetic. If you enter an equivalent allowance, use a decimal percentage: 33.33 is an approximation to 33 1/3%, and fractional text is not accepted in this field.
Choose an allowance for the stock and project
Published advice uses different starting assumptions. In its 2019 answer, WOOD Magazine suggests an initial 15% addition, then adjustments for the design, species appearance and lower grades. Woodworkers Source advises listing project parts, totaling their board footage by thickness group, and multiplying each sum by at least 1.5. A 1.5 multiplier adds 50%; it would mean entering 50 in a percentage field.
Those recommendations belong to their respective sources. Use the details of your own purchase to choose an assumption:
- Check whether your tally describes stock or finished parts, and whether it already includes a reserve.
- Compare the required part lengths, widths and thicknesses with the available boards and planned cuts.
- Inspect defects and decide which grain or color differences are acceptable for the project.
- Identify material needed for preparation, test pieces or a reserve, and discuss suitable stock with the seller.
Reproduce the example in the calculator
- Open the board-foot calculator. Enter thickness
1, width6, length8withftselected, and quantity5. - Enter the illustrative price
7.50and buying allowance25. Choose Calculate my tally. - Check exact volume 20.00 BF, buying allowance +5.00 BF, volume with allowance 25.00 BF, material cost $150.00 and cost with allowance $187.50.
- Change the allowance to
12.5and calculate again. The extra volume becomes 2.50 BF, the adjusted total 22.50 BF and cost with allowance $168.75. - Set allowance to
0and calculate again to compare the base tally. Use Print tally or Export CSV to keep the current result.
For different board sizes, follow the mixed-board shopping-list example. For a whole-board quote, use price per board foot vs price per board to check the pricing basis.
Apply the chosen addition once
If a 20-BF starting list already has 25% added, it totals 25 BF. Adding another 25% to that adjusted total gives 20 × 1.25 × 1.25 = 31.25 BF, a cumulative 56.25% increase over the original list.
Record any reserve already included in an order before adding another. Keep supplier charges separate from your extra-material assumption, and confirm available boards, billed dimensions, rounding and included services before purchasing.